2005-04-11

Introducing Requirements Management

Archived from the original ManageWithoutThem Blogspot post · 2005-04-11.

Tonight I'm thinking about 'requirements management' for work. I have to introduce a requirements management discipline to an existing project. I get the impression that requirements management is being seen a primarily about change control; or rather reducing scope creep. But I know that requirements management is so much more than that.

Requirements management is about coordinating the transition of high-level requirements into detailed requirements. It's about managing the inherent uncertainty of requirements specification and coordinating the transition from uncertainty to specifications (or in low risk or repeatable cases - directly to code).Â

I'm trying to working out the main theme I need to introduce the discipline into the organization.

What has requirements?

You see, it's not just the project which has requirements. End-to-end (and layer-through-layer) requirements management includes the allocation of specific requirements to specific components of the solution architecture. This hooks the requirements management process into the project's design management, specification management (including modeling), and architecture management processes.

What types of requirements are there?

Some requirements management tenets (these do or should always remain true)

Specification of the external behaviour of the system (such as 'functional specifications') is not requirements management. These specifications tend to be an incomplete record of an unmanaged design process.

What does it mean for something to be managed?